Construction Capabilities – Overview

 

Construction Process

  • Engineering – Agra, Partners, City, Utilities
  • Process – Permits
  • Site Layout
  • Drainage
  • Excavation
  • Concrete for Buildings/Equipment/ Roads
  • Buildings
  • Equipment Supports – Process Tanks & Piping

 

Bid Packages

  • Excavation – Site Wide & Drainage & Landscaping
  • Concrete – Buildings, Equip Supports, Driveways and parking Lots
  • Buildings – Pre-engineered, Stick Built
  • Misc. Support Structures & Tanks
  • Mechanical – HVAC for Various Buildings
  • Process Electrical – Lighting, Process Power & Controls
  • Gas – Process Gas & General Building Gas/Heat
  • Carpentry – Admit Building, Control Rooms, MCC Rooms
  • Process Mechanical/Piping and Equip Installation
  • Misc. General Laborers

 

Site Layout

  • Concrete inspections – check layout of rebar, anchor bolts, imbed plates, concrete form layout and dimensions and elevations.
  • Pre engineered building layout, and installation.
  • Equipment installation layout and location.
  • Millwright layout and installation.
  • Electrical installation layout and location.

Construction Scheduling

  • Agra Industries, Inc. scheduler works with the project manager to develop a project schedule consisting of engineering, procurement, fabrication and on site installation/construction.
  • Makes regular site visits to make schedule up dates and will attend bi-weekly progress meeting.  On the weeks that the scheduler is not on site up dates will be made over a conference call with the site superintendent/foreman.
  • Meets weekly with the Agra Industries, Inc. engineering department and fabrication department for schedule reviews.

Construction Time Frame

AGRA CONSTRUCTION

Safety Manual Outline

 

I.                     Chapter 1 – Injury and Illness Prevention Program

II.                  Chapter 2 – General Code of Safe Work Practices

III.                Chapter 3 – Chemical Safety

IV.               Chapter 4 – Confined Spaces

V.                 Chapter 5 – Electrical Safety

VI.               Chapter 6 – Employee Emergency Action Plan

VII.             Chapter 7 – Building Management and Construction

VIII.           Chapter 8 – Fire Protection Program

IX.               Chapter 9 – Gases

X.                 Chapter 10 – Mechanical Guarding

XI.               Chapter 11 – Materials Handling, Cranes, Rigging

XII.             Chapter 12 – Noise

XIII.           Chapter 13 – Personal Protective Equipment

XIV.         Chapter 14 – Environmental Protection

XV.           Chapter 15 – Ladders and Scaffolds

XVI.         Chapter 16 – Fall Protection

XVII.       Chapter 17 – Excavation

XVIII.     Chapter 18 – Safety Training

XIX.         Chapter 19 – Tools

XX.           Chapter 20 – Traffic and Transportation Control

XXI.         Chapter 21 – Hazard Warnings

XXII.       Chapter 22 – Carcinogens

XXIII.     Chapter 23 – Sanitation

XXIV.    Chapter 24 – Abrasive Blasting Operations

XXV.      Chapter 25 – Mobile/Powered Construction Equipment Including Aerial Lift Equipment

XXVI.    Chapter 26 – Cranes and Hoisting Equipment

XXVII.  Chapter 27 – 1926 Subpart R, Steel Erecting

XXVIII.  Forms


 

Recently Completed Projects

AI01067 - Pine Lake Corn Processors - Pine Lake, IA

AI01095 - CP Feeds

AI1059 - Golden Oval - FEEDMILL

 

Copyright © 2000-2008 AGRA Industries, Inc. | Home | Up | Add Contact Info | Site Map | Contact Info | Employment | Security and Privacy | AGRA FTP | AGRA_Banner_600x300